A PK superstructure featuring a Palfinger PK 53002 SH crane with a 21-meter reach and a TS-6.5 platform measuring 6500 mm in length has been delivered to Tehnikagradnja d.o.o. The superstructure is mounted on a MAN TGS 26.500 6×4 BL chassis.
The Palfinger PK 53002 SH crane includes eight hydraulic extensions, providing a total outreach of 21 meters. The superstructure is equipped with a platform featuring aluminum side panels, also 6,500 mm long. The platform frame includes integrated openings for easy load securing, while the floor is fitted with lashing rings for additional load tie-down options. The front and rear posts are fixed, and the center posts are foldable and removable.